China Molybdenum: TFM Mixed Mine achieved the goal of "double standard" as scheduled

Luoyang Molybdenum Industry News: As of June 30th, the average monthly production of cathode copper in the TFM mixed ore east area exceeded 18,000 tons for three consecutive months, reaching 105% of the production target. The average monthly production of cobalt hydroxide exceeded 900 tons, reaching 100% of the production target. At the same time, the quality of cathode copper products reached 99% HG+ST, and the cobalt content of cobalt hydroxide reached above 37%. The planned production volume and quality of the products have both met the standards, which means that the eastern area of the mixed ore has the production capacity of 200,000 tons of copper and 12,000 tons of cobalt per year.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate app
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)